Parking Lot B to Close

Office of Communications | June 07, 2016
Map of construction site

Map of construction site

Parking Lot B, opposite the Clark Athletic Center, is scheduled to close permanently on Monday, June 13, or sometime shortly thereafter. It will become a construction site for necessary utility work prior to the construction of residence halls, which will begin in the fall. 

The pedestrian pathway from Lot D through Lot B will also close. Pedestrians will need to exit Lot D either at the stairway near the half-moon parking area or take the sidewalk along Mt. Vernon Street to the University Drive entrance to campus near the softball field.

Lot D and the Bayside Lot remain open this summer. The free Route 3 shuttle bus services students, faculty, and staff between Bayside and the Clark Athletic Center and the Campus Center. Please allow extra time and plan accordingly. Download the UMass Boston app or Transloc to view real-time UMass Boston shuttle bus traffic.

The work will be performed in keeping with monitoring plans that comply with the state Department of Environmental Protection regulations.

Larger scale Utility Corridor and Roadway Relocation project work is expected to resume in the near future, which will require more roadway changes. Future Construction Updates will provide information as the revised UCRR project schedule becomes available.

Tags: construction , parking , parking lot closure , transportation

Comments not allowed for this story